skip to Main Content
(248) 706-1540 sales@KorsEngineering.com

Save $474,500 each year with Mach2

The potential cost savings of implementing Mach2 is immense. The below example calculates the savings for a manufacturing plant with 20 integrated machines running 24/7. Each hour, an operator records production 10 times into an ERP system. This transaction consumes approximately…

Read More
Back To Top