Save $474,500 Each Year With Mach2

Save $474,500 each year with Mach2

The potential cost savings of implementing Mach2 is immense. The below example calculates the savings for a manufacturing plant with 20 integrated machines running 24/7.

Each hour, an operator records production 10 times into an ERP system. This transaction consumes approximately 30 seconds to complete. If a manufacturing plant has 20 machines with this process, and each operator’s loaded wage is $25/hour, it is costing the plant $365,000/year to simply record production. Not to mention, the operator also needs to spend time recording scrap and updating the machine status.

Implementing Mach2 on your shop floor allows these processes (and others) to be fully automated; saving your plant time and money.